This Supplemental/Bid Bulletin is issued to clarify or amend some provisions originally indicated in the Bidding Documents, in compliance with Section 22.5.2 of the Revised Implementing Rules and Regulations of Republic Act 9184, to wit:
Issue/Clarification
(ORIGINAL) |
Response (AMENDED, see capitalization and underlined words) |
Section VII: Technical Specifications |
Section VII: Technical Specifications |
Boom Lift Included: • Warranty- 1 year • Supply, Delivery, Set-Up and Demonstration • Brand New
Specifications: • Type-Trailer-Mounted Articulated Boom Lift • Working Height: Min. 12-Max. 18 meters • Platform Height: Min. 10- Max. 18 meters • Horizontal Outreach: Min. 5-Max. 10 meters • Platform Capacity: Min. 200 kg • Platform Material: Steel • Swing (slew): 360 degrees non-continuous • Width-traveling: Min. 1.50-Max. 1.80 meters • Width-working: Min. 2.70- Max. 3.0 meters • Height-stowed: Min. 1.90- Max. 2.0 meters • Length-stowed: Min. 5.50- Max. 6.0 meters • Tires- Pneumatic • Power System: Bi-energy; Battery 24V/120Ah |
Boom Lift Included: • Warranty- 1 year • Supply, Delivery, Set-Up and Demonstration • Brand New
Specifications: • Type-Trailer-Mounted Articulated Boom Lift • Working Height: Min. 12-Max. 18 meters • Platform Height: Min. 10- Max. 18 meters • Horizontal Outreach: Min. 5-Max. 10 meters • Platform Capacity: Min. 200 kg • Platform Material: Steel • Swing (slew): 360 degrees non-continuous • Width-traveling: Min. 1.50-Max. 1.80 meters • WIDTH-WORKING: MIN. 2.70 UP TO MAX. 3.5 METERS • HEIGHT-STOWED: MIN. 1.90- MAX. 2.2 METERS • LENGTH-STOWED: MIN. 5.50- MAX. 6.3 METERS • Tires- Pneumatic • POWER SYSTEM: BI-ENERGY; (DIESEL ENGINE & BATTERY 24V/120AH) |
Delivery Schedule: Thirty (30) Calendar Days from the Date of Receipt of Notice to Proceed (NTP). |
DELIVERY SCHEDULE: ONE HUNDRED TWENTY (120) CALENDAR DAYS FROM THE DATE OF RECEIPT OF NOTICE TO PROCEED (NTP). |
This shall form an integral part of the bidding documents. Any provisions in the Bidding Documents inconsistent herewith is hereby cancelled, modified, and superseded accordingly.
For guidance and information of all concerned.
(Original Copy Signed)
ENGR. VINA G. MUNDALA Chief-PFMO,
End-user
((Original Copy Signed)
ATTY. CARLO FLORENDO C. CASTRO
PLM-BAC Chairperson